The Northern Collector Tunnel is a 12km long raw water transfer tunnel meant to transport abstracted water from three rivers in Muranga to Ndakaini Dam for consumption in Nairobi. The Tunnel has a diameter of 4m when excavated and internal diameter of 3m when fully supported. Excavation is done using mechnical means as well as drill and blast.